Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Arias, S (2014) Engineer manual 385 effectiveness: A study of predictive analytics, Unpublished PhD Thesis, , Indiana State University.

Bradford, C W (2017) The impact of the systematic incorporation of tolerances on gypsum board installation, Unpublished PhD Thesis, , Indiana State University.

Bruce, R D (2008) A study of craft worker length of employment at select Missouri construction companies, Unpublished PhD Thesis, , Indiana State University.

  • Type: Thesis
  • Keywords: construction firms; employment; carpenter; employee; future studies
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304608198
  • Abstract:
    Craft worker retention is a constant concern of construction firms who self-perform portions of projects. These companies must maintain an understanding of their work force. A methodology is presented in this study for studying information in readily available employee databases to gain such an understanding. Using a sample of 10 of Missouri's 17 largest contractors, that employ 5,277 craft workers; this study examined the employee databases to identify differences in mean length of employment based on hire age, craft, union affiliation, and company size. The analysis of variance statistical technique was utilized to test four null hypotheses. Based on the test results, the researcher was unable to reject the null hypothesis that there were no statistically significant differences between the mean length of employment for craft workers based on five hire age categories (16-24, 25-34, 35-44, 45-54, and 55 & up) or union affiliation (union versus non union). However, results indicated that operators had a statistically significant (. 05 alpha) longer length of employment than carpenters, laborers, and iron workers. Also, results indicated that craft workers at medium-sized companies had a statistically significant longer length of employment than craft workers at small and large construction companies. The researcher recommended future studies to address why craft workers at medium-sized construction firms and operators in general would have a greater mean length of employment.

Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes, Unpublished PhD Thesis, , Indiana State University.

Chukwu, I (2018) Sustainability in the Nigerian construction industry: The feasibility of adopting green building rating system, Unpublished PhD Thesis, , Indiana State University.

Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules, Unpublished PhD Thesis, , Indiana State University.

Fee, S T (2005) Sustainable construction practices: Contractors' perceptions of awareness and participation, Unpublished PhD Thesis, , Indiana State University.

Graham, G (2016) Factors influencing and risk associated with the use of drones by specialty construction companies in the United States of America, Unpublished PhD Thesis, , Indiana State University.

Gravitt, D D (2004) The development and validation of a bar code based residential construction quality inspection procedure, Unpublished PhD Thesis, , Indiana State University.

Haddad, B (2007) Risk management in the contractual language in the construction industry: The effect of exculpatory clauses on contractor bid price, Unpublished PhD Thesis, , Indiana State University.

Kamm, J D (2017) A study of technological change in the construction industry through understanding the importance of innovation, risk and stakeholder alignment in construction lending, Unpublished PhD Thesis, , Indiana State University.

Mutai, A (2009) Factors influencing the use of building information modeling (BIM) within leading construction firms in the United States of America, Unpublished PhD Thesis, , Indiana State University.

Ohrn, G (2009) The influence of job-order-contracting as a construction project delivery method on owner satisfaction, Unpublished PhD Thesis, , Indiana State University.

Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects, Unpublished PhD Thesis, , Indiana State University.

Onsarigo, L M (2016) Cost comparison of horizontal auger boring and open-cut construction methods for culvert installations, Unpublished PhD Thesis, , Indiana State University.

Patton, J R (2013) Task diminishment: Construction value loss due to sub-optimal task execution, Unpublished PhD Thesis, , Indiana State University.

Rich, F A (2020) Managing the wear of heavy construction equipment steel track undercarriage by soil sand content, Unpublished PhD Thesis, , Indiana State University.

Sauer, A D (2013) Sustainable building codes: How the perceptions of building code officials influence their intent to adopt the international green construction code, Unpublished PhD Thesis, , Indiana State University.